PORTFOLIO

What we do

SLS Core Stage Major Joins

Developed a custom system for tracking a 30-foot diameter barrel component into mating position, providing real-time positioning that enabled the move team to glide the component into position with minimal clearances.


Statistics


  • Highest-risk operation for the first Core Stage
  • Real-time feedback of position
  • Performed for every horizontal major join for every Core Stage
  • Able to get component into final position within a few hours