The LH2 ducts need to be precisely located to mate up with the downstream ducts and provide proper flow for the fuel. Boeing called on Shape Fidelity to live-track the components into place to reduce assembly time.
Statistics
Real-time feedback of position
Located both ends of the duct precisely
Cut installation time by more than half
Buy-off of final installed position at the same time